Category Archives: Application for Renewed Operating License

People Passing Through: Traffic and Business Corridors

Advertisements

Posted in Application for Renewed Operating License, Corridors, Documents and Reports, Environmental Impact Statement, Minnesota, Monitoring, Monticello Nuclear Power Plant, Northern States Power Company, NRC, Nuclear, People, Safety | Leave a comment

Failings of the Environmental Impact Statement

Appendix A (from the 2006 EIS): Comments regarding a letter from the NRC to Mr. Dan P. Stinnett (Field Supervisor, US Fish and Wildlife Services), RE: Request for list of Protected Species within the area under evaluation for the Monticello … Continue reading

Posted in Application for Renewed Operating License, Corridors, Criticism of NRC Reports, Documents and Reports, Environmental Impact Statement, Get Involved, Global Fallout, Issues, Minnesota, Monitoring, Monticello Nuclear Power Plant, NRC, Nuclear, Performance Evaluation, Power, Radiation Information, Safety, US Nuclear Power Plants, Watershed, Wildlife | 2 Comments

NRC’s 2009 “Risk Review Inspection Report”

2009 Letter from the Nuclear Regulatory Commission to Monticello Plant containing the “Risk Review Inspection Report” (citing some violations) — Full Text (PDF) Excerpts:

Posted in Application for Renewed Operating License, Documents and Reports, Issues, Minnesota, Monitoring, Monticello Nuclear Power Plant, NRC, Nuclear, People, Performance Evaluation, Power, Radiation Information, Radioactive, Safety, Sampling, Utilities, Xcel Energy | 1 Comment

Past Issues at the Monticello Plant – 1991 Refueling Outage

Letter from Monticello (Northern States Power Company) to the NRC explaining the “Repair of Torus Indication During 1991 Refueling Outage”– Full PDF of Letter (1991) Excerpts:

Posted in Application for Renewed Operating License, Documents and Reports, Energy, Image, Issues, Map, Minnesota, Monitoring, Monticello Nuclear Power Plant, Northern States Power Company, NRC, Nuclear, Performance Evaluation, Power, Radioactive, Safety, Sampling, Xcel Energy | Tagged | 1 Comment

Severe Accident Mitigation Alternatives for the Monticello (TAC NO. MC6441)

Response to Request for Additional Information Regarding Severe Accident Mitigation Alternatives (NRC, 2005) Excerpts:

Posted in Application for Renewed Operating License, Criticism of NRC Reports, Documents and Reports, Emergency Planning, Minnesota, Monitoring, Monticello Nuclear Power Plant, NRC, Performance Evaluation, Power, Safety, Sampling | Tagged | 2 Comments

Operating License Renewal Application

Renewed License Issued 11/08/2006 Link to Full License Renewal Application Link to NRC’s Safety Evaluation Report Independent Evaluation of EIS Minnesota Agencies Evaluation of EIS Operating License Renewal Application – Appendix E: Environmental Report (2010) Excerpts: …

Posted in Application for Renewed Operating License, Documents and Reports, Monticello Nuclear Power Plant, NRC, Nuclear | 1 Comment